Notice of Water Service Disruption Sample Clauses

Notice of Water Service Disruption. The Contractor shall plan and coordinate all service outages with the COR and GIRoA Facilities Engineer for all GIRoA site buildings. The Contractor shall notify the affected parties at least seven calendar days prior to the scheduled outage. In the event of a water line or main break, the Contractor shall disinfect the lines and main in accordance with Government or Host Nation requirements. The Contractor shall post a notice in Dari, Pashto and English to each building affected by the water line break as follows: “Water is Non-Potable – Do Not Drink Water Until Further Notice.” The notice shall be posted prior to restoration of water service to affected buildings. Upon completion of disinfection and flushing, the Contractor shall take a bacteriological sample, and upon notification of an acceptable bacteriological analysis, the Contractor shall notify the COR and GIRoA Facility Engineer, and remove all notices that have been posted. The Fire and Emergency Services Activities, COR and GIRoA Facility Engineer shall be notified immediately when any section of the water distribution system is out of service and when the system has been returned to normal service. The Contractor shall make every attempt to utilize existing loop systems to minimize the impact on normal service operations. The Contractor shall provide temporary water service, including domestic hot water, to critical facilities while the system is down, if directed by the COR.

Get the Official Word Add-in

Related Clauses

Related to Notice of Water Service Disruption